TGS DUYEN HAI NEARSHORE WIND POWER PLANT
1. Project name |
TGS Wind Power Plant – 500 MW |
2. Location |
Nearshore Duyen Hai district, Vinh Long Province |
3. Distance from the H2/NH3 plant |
~ 20 kms |
4. Water depth |
~ 5-8 meters |
5. Average annual wind speed |
~ 7.8 m/s (@140m) |
6. Survey area |
~ 5,800 hectares |
7. Total installed capacity |
~ 500 MW |
8. Wind turbine |
~ 8.5 MW |
9. Electricity production |
~ 1,870 GWh/year |
The Green Solution Group’s offshore wind power project is an advanced renewable energy solution, harnessing the strong and steady winds of the Duyen Hai – Vinh Long coastal area to generate clean electricity for the NH3 plant. This technology not only significantly reduces CO₂ emissions and helps protect the environment, but also drives green economic growth and sustainable development in the region.
Project Information
1. Project name |
TGS Duyen Hai Nearshore Wind Power Plant - 500 MW |
2. Location |
Duyen Hai District, Vinh Long Province |
Area (ha) |
|
3. Distance from the H2/NH3 plant |
~ 20 km |
4. Water depth |
~ 5-8 meters |
5. Average annual wind speed (@140m) |
~ 7.8 m/s |
6. Total installed MW |
~ 485 MW
|
7. Wind turbine |
~ 57*8.5 MW |
8. AEP (P50) |
~ 1,87 (GWh/year) |
9. Electricity generation classification |
Self-produced and self-consumed electricity |
10. Connection to Hydrogen plant |
33kV submarine cables (8km) and OHL (12km) |
Project Legal
No. |
PROJECT LEGAL |
MAIN CONTENTS |
REFERENCE |
1 |
TRA VINH PROVINCE PLAN FOR THE PERIOD 2021 - 2030 |
List of TGS's proposal projects allows to develop periods to 2030 in Tra Vinh 1. TGS Duyen Hai Solar Power Plant - 500MW |
APPENDIX VI, No. 1142/QĐ-TTg dated 02/10/2023 |
2 |
Assessing the overall wind energy potential of Vinh Long Province |
Planned 4000ha nearshore DG KV H. Duyen Hai for building a 500MW wind power plant to supply power for Hydrogen manufacturing |
1579/UBND-CNXD dated 26/03/2025, Tra Vinh PPC |
3 |
Project survey Permit (inside 6 miles area, 1950ha) |
Tra Vinh Provincial People's Committee Granted for conducting the survey phase 1, 200MW |
2696/UBND-CNXD dated 16/05/2025, Tra Vinh PPC |
4 |
Project survey Permit |
Tra Vinh Provincial People's Committee Granted for conducting the survey phase 2, 300MW |
TBC |